Article Image Alt Text
Article Image Alt Text
Article Image Alt Text

Excitement builds as MPCC renovation takes shape

The Mid-Plains Community College addition in Imperial is steadily taking shape. The outside siding and roof is completed, middle. The inside is a maze of halls and open spaces where workmen have been busy installing door frames, painting walls and tiling bathrooms. At top, a back room is full of equipment and supplies as electrical, heat and air conditioning work is being done. The goal is to be finished with the new addition by the end of November or early December, at which point renovation of the original building will begin.

 

The Imperial Republican

308-882-4453 (Phone)

622 Broadway St

PO Box 727

Imperial, NE 69033